openclaw skills install @yanghe1941/adaptive-etaGive the user an honest time estimate before long-running work, re-estimate when it runs over, and ask before blowing far past it. Use for multi-step tasks expected to take more than ~2 minutes or 4+ tool calls — research, batch file processing, builds, migrations, multi-file edits, data analysis. Skip for quick answers and single-step edits. 长任务时间预估:预计超过约 2 分钟或需 4 次以上工具调用的多步任务,先报预估时间,超时主动更新,严重超时先征得同意。
openclaw skills install @yanghe1941/adaptive-etaNever leave the user waiting in silence. Promise a time, track it with a real clock, correct it honestly, and learn from the gap.
You cannot feel time passing between tool calls — the script is your clock. Trust its numbers over your sense of progress.
| Expected duration | What to do |
|---|---|
| < 30s, or a direct answer | Nothing. Just do it. |
| 30s – 2 min | One line up front ("About a minute."). No timer. |
| > 2 min, or ≥ 4 tool calls | Full protocol below. |
When unsure, lean toward the lighter tier. An ETA on a trivial task is noise.
scripts/timer.py sits next to this file. Call it by absolute path (resolve this skill's directory once), e.g. python3 <skill-dir>/scripts/timer.py check. State is stored in ~/.adaptive-eta/ (override with ADAPTIVE_ETA_HOME); add --task <id> only if you run parallel timers.
| Command | When |
|---|---|
start --eta <sec> --label "<what>" | Right after estimating, before the first real step |
check | At each step boundary (see below) |
revise --eta <remaining sec> --reason "<why>" | After telling the user a new estimate. Keeps the original ETA for the 3× rule |
stop (or stop --outcome aborted) | When the work ends, before the final report |
calibrate | Optional; shows how accurate past estimates were |
1. Estimate. Break the task into 3–5 steps, estimate each, sum, add ~20% buffer. Run start. If it prints a CALIBRATION line, your past estimates were off — use its suggested figure and run the revise it shows.
2. Announce. One or two lines, in the user's language: total time and the steps. Round honestly; a range is fine.
About 5 minutes: read the 12 files (~1 min), draft the changes (~3 min), run tests (~1 min).
3. Check at step boundaries — not around every tool call. Run check when you finish a planned step, and before starting anything that may block for more than a minute (long builds, big downloads). Act on the status:
| STATUS | Action |
|---|---|
ON_TRACK | Continue. Say nothing. |
THRESHOLD_REACHED | ≥80% of the window used. If nearly done, finish. Otherwise re-estimate, tell the user, revise. |
EXPIRED | Tell the user what is slower than expected and the new remaining time, then revise. |
OVERRUN | Over 3× the original estimate. Stop and ask: continue, cut scope, or stop? Wait for an answer. |
NOT_RUNNING / STALE | No live timer. start again if work continues. |
An update names the cause, not just a number:
Slower than planned — the test suite takes ~4 min per run. About 6 more minutes.
4. Deliver. Run stop, then add its REPORT line in one short line at the end of the result:
Estimated 5m · actual 7m20s · 1 revision
revise — that is not an overrun.stop, including when the task fails or the user cancels (--outcome aborted). That keeps calibration honest.