Opportunity Assessment

v1.0.0

商机判断与风险评估技能。接收新项目信息,主动询问关键问题(客户背景、时间要求、第三方集成等),输出风险分级评估、待确认事项清单、商机建议。适用于销售前期、项目立项、商机评审场景。

0· 299·1 current·1 all-time

Install

OpenClaw Prompt Flow

Install with OpenClaw

Best for remote or guided setup. Copy the exact prompt, then paste it into OpenClaw for yakov0922/opportunity-assessment.

Previewing Install & Setup.
Prompt PreviewInstall & Setup
Install the skill "Opportunity Assessment" (yakov0922/opportunity-assessment) from ClawHub.
Skill page: https://clawhub.ai/yakov0922/opportunity-assessment
Keep the work scoped to this skill only.
After install, inspect the skill metadata and help me finish setup.
Use only the metadata you can verify from ClawHub; do not invent missing requirements.
Ask before making any broader environment changes.

Command Line

CLI Commands

Use the direct CLI path if you want to install manually and keep every step visible.

OpenClaw CLI

Canonical install target

openclaw skills install yakov0922/opportunity-assessment

ClawHub CLI

Package manager switcher

npx clawhub@latest install opportunity-assessment
Security Scan
VirusTotalVirusTotal
Benign
View report →
OpenClawOpenClaw
Benign
high confidence
Purpose & Capability
Name and description (商机判断与风险评估) match the SKILL.md content: it defines question templates, risk dimensions, output formats, and uses two local reference docs. It does not request unrelated binaries, env vars, or credentials.
Instruction Scope
Runtime instructions are limited to asking the user contextual questions and producing textual risk assessments and checklists. They reference only the included local reference files. There are no steps to read arbitrary system files, exfiltrate data, or contact external endpoints.
Install Mechanism
No install spec or code files beyond plain text docs — nothing is downloaded or written to disk by an installer. This minimizes install-time risk.
Credentials
The skill declares no required environment variables, credentials, or config paths. That aligns with its purely conversational/assessment role.
Persistence & Privilege
always is false and the skill does not request persistent privileges or modifications to other skills or agent configs. Autonomous invocation is allowed (platform default) but not combined with other red flags here.
Assessment
This skill appears coherent and low-risk: it only contains instructions and reference docs for conducting opportunity/risk assessments. Before installing, confirm the skill source (unknown owner) if you require provenance. Be mindful of what you send the skill: do not share highly sensitive customer data or credentials in prompts or attachments. Because the skill is an instruction-only template, review outputs for correctness and adapt any company-specific legal/contract/payment rules before acting on its advice. If you need auditability, ask the publisher for provenance or a changelog.

Like a lobster shell, security has layers — review code before you run it.

latestvk971mmfx4ahjjqzc147qzymh6s828nch
299downloads
0stars
1versions
Updated 1mo ago
v1.0.0
MIT-0

商机判断技能

核心目标

快速识别商机质量,评估风险等级,明确待确认事项,辅助决策是否承接项目。


工作流程

第一步:接收项目信息

用户可能提供:

  • 文本描述:项目概况、客户需求
  • 文档/截图:需求文档、聊天截图、会议纪要

第二步:主动询问(必须)

收到项目信息后,必须主动询问以下关键问题(根据项目情况选择):

客户背景

  1. 是不是老客户? 之前合作过哪些项目?
  2. 客户行业属性? 政府/企业/教育/医疗等
  3. 预算范围有预期吗? 大概什么量级?
  4. 决策链是怎样的? 谁是最终决策人?

项目要求

  1. 项目时间要求? 什么时候上线?有硬性 deadline 吗?
  2. 项目规模预期? 小型/中型/大型?
  3. 是否需要多端支持? Web/小程序/APP/鸿蒙?

技术风险

  1. 涉及第三方系统吗? 有哪些?API 文档有吗?
  2. 有技术栈要求吗? 指定技术或平台?
  3. 数据从哪里来? 客户提供还是我们采集?
  4. 有没有高并发预期? 预计用户规模?

商务风险

  1. 付款方式? 预付款比例?验收标准?
  2. 有没有竞品对比? 还有谁在跟进?
  3. 客户期望的合作模式? 外包/联合开发/技术入股?

其他

  1. 有没有参考产品? 类似的项目案例?
  2. 售后要求? 运维期多久?SLA 要求?

第三步:风险评估(按级别输出)

风险分级标准

级别标识说明
🔴 高风险严重影响交付可能导致项目失败、延期、亏损
🟡 中风险影响执行效率需要额外资源或时间投入
🟢 低风险轻微影响可接受,常规处理即可

风险评估维度

  1. 交付风险 - 工期、技术难度、人员匹配
  2. 商务风险 - 预算、付款、合同条款
  3. 技术风险 - 第三方依赖、性能要求、数据安全
  4. 客户风险 - 决策链、配合度、需求稳定性

第四步:输出待确认事项

列出需要客户协助确认的事项,按优先级排序:

优先级待确认事项影响建议沟通方式
P0.........
P1.........

第五步:商机建议

基于以上分析,给出承接建议

  • 建议承接 - 风险可控,利润合理,客户优质
  • ⚠️ 谨慎评估 - 存在一定风险,需进一步确认
  • 不建议承接 - 风险过高,投入产出比低

输出格式

重要:飞书消息不支持 markdown 表格,全部使用纯文本格式!

1. 项目概况(简要)

项目名称:XXX
客户类型:新客户/老客户
预算范围:XXX
预期上线:XXX

2. 风险分级清单

🔴 高风险事项
- [风险描述] 影响:[说明] 建议:[应对措施]

🟡 中风险事项
- [风险描述] 影响:[说明] 建议:[应对措施]

🟢 低风险事项
- [风险描述] 影响:[说明] 建议:[应对措施]

3. 待确认事项(需要客户协助)

注意:不要用 markdown 表格,用纯文本列表格式

P0 紧急(影响报价/立项)
- [事项 1]
- [事项 2]

P1 重要(影响执行)
- [事项 1]
- [事项 2]

P2 一般(可后续确认)
- [事项 1]
- [事项 2]

4. 商机建议

综合评估:✅建议承接 / ⚠️谨慎评估 / ❌不建议承接

理由:
- 优势:...
- 劣势:...
- 关键决策点:...

注意事项

  1. 必须主动询问 - 不要直接给评估,先问清楚背景
  2. 风险透明 - 不确定的地方要明确标注
  3. 分级清晰 - 高/中/低风险用 emoji 标识,一目了然
  4. 可执行 - 每条风险都要有应对建议
  5. 待确认事项 - 明确哪些需要客户协助,优先级排序

相关资源

  • 风险评估标准:references/风险评估标准.md
  • 常见问题清单:references/常见问题清单.md