openclaw skills install tonic-system-deploySoftware deployment workflow for systems with separate UAT and PROD environments. Use when: planning a bug fix deployment, choosing between Flow 1 (UAT-first) and Flow 2 (PROD-first), handling emergency hotfixes, executing rollbacks, or designing automated nightly deploy pipelines. Covers approval gates, human checkpoints, system automation nodes, Telegram notifications, and rollback procedures.
openclaw skills install tonic-system-deploySoftware Deployment Workflow — Dual-Environment (UAT + PROD)
This skill was designed for systems where:
The key insight: choosing the wrong deploy flow when versions are mismatched can introduce regressions. Flow 1 assumes parity; Flow 2 handles divergence safely.
| Question | Answer → |
|---|---|
| Are UAT and PROD on the same version? | → Flow 1 |
| Is UAT ahead of PROD by any version? | → Flow 2 |
| Is this a critical/high severity bug? | → Emergency Hotfix (bypass pipeline) |
| Do you need to undo a bad deploy? | → Rollback |
Bug found
│
├─ severity = critical/high?
│ └─ YES → Emergency Hotfix (skip pipeline)
│
├─ UAT version == PROD version?
│ └─ YES → Flow 1
│
└─ UAT version > PROD version?
└─ YES → Flow 2
Scenario: Bug found in UAT or PROD when both environments run the same version. Goal: Fix → validate in UAT → promote to PROD. Result: UAT and PROD converge to same patched version.
Bug reported
│
│ 🧑 HUMAN: Admin reviews + confirms bug (status: confirmed)
▼
[confirmed] — severity: low/medium only
│
│ 🤖 SYSTEM: Scheduled deploy time T1 (e.g. 20:00)
│ - AI analyses root cause + records fix plan
│ - Deploys fix to UAT environment
│ - Status → deployed_uat
▼
[deployed_uat]
│ 📲 Telegram: "Fix deployed to UAT. Please validate."
│
│ 🧑 HUMAN: Admin logs into UAT, validates fix
│ - Runs through affected workflows
│ - Confirms no regression
│ - Clicks "Approve PROD Deploy" → status: pending_prod
▼
[pending_prod]
│ 📲 Telegram: "Queued for PROD at T2."
│
│ 🤖 SYSTEM: Scheduled deploy time T2 (e.g. 22:00)
│ - Deploys fix to PROD environment
│ - Status → deployed_prod
▼
[deployed_prod] ✅ Flow 1 Complete
│ 📲 Telegram: "Deployed to PROD. Flow 1 complete."
| Checkpoint | Who | Action | Gate Condition |
|---|---|---|---|
| Confirm bug | Admin/Manager | Mark as confirmed | Bug is reproducible and valid |
| UAT validation | Admin/Manager | Click "Approve PROD Deploy" | Fix works, no regression in UAT |
| Time | Node | Input Status | Output Status | Action |
|---|---|---|---|---|
| T1 | Phase 1 | confirmed/planned | deployed_uat | AI analysis + UAT deploy |
| T2 | Phase 2 | pending_prod | deployed_prod | PROD deploy |
Scenario: Bug found in PROD when UAT is ahead by one or more versions. Why not Flow 1? Validating a PROD fix in a newer UAT environment risks false confidence — the fix may behave differently on the older PROD codebase. Goal: Fix PROD directly → validate in PROD → cherry-pick back to UAT. Result: PROD gets the fix immediately; UAT gets it merged back after PROD validation.
Bug found in PROD (UAT is ahead)
│
│ 🧑 HUMAN: Admin reviews + confirms bug
│ - Selects: found_in_env = prod, fix_flow = flow2
│ - Status → confirmed
▼
[confirmed]
│
│ 🤖 SYSTEM: Scheduled deploy time T1 (e.g. 20:00)
│ - AI analyses root cause + records fix plan
│ - Skips UAT entirely
│ - Queues for PROD deploy → status: pending_prod
▼
[pending_prod]
│ 📲 Telegram: "PROD deploy queued for T2 (Flow 2)."
│
│ 🤖 SYSTEM: Scheduled deploy time T2 (e.g. 22:00)
│ - Deploys fix to PROD
│ - Status → deployed_prod
▼
[deployed_prod]
│ 📲 Telegram: "Deployed to PROD. Please validate PROD. Approve UAT merge when ready."
│
│ 🧑 HUMAN: Admin validates fix in PROD
│ - Confirms fix works on production data/config
│ - No regression in PROD workflows
│ - Clicks "Approve Merge UAT" → status: pending_uat_merge
▼
[pending_uat_merge]
│ 📲 Telegram: "UAT merge queued for T2 tonight."
│
│ 🤖 SYSTEM: Next T2 cycle (22:00)
│ - Deploys/merges fix into UAT environment
│ - Status → uat_merged
▼
[uat_merged] ✅ Flow 2 Complete
│ 📲 Telegram: "Merged to UAT. Flow 2 complete."
| Checkpoint | Who | Action | Gate Condition |
|---|---|---|---|
| Confirm bug | Admin/Manager | Mark as confirmed + select flow2 | Bug confirmed in PROD, version mismatch verified |
| PROD validation | Admin/Manager | Click "Approve Merge UAT" | Fix verified in PROD, no regression |
| Time | Node | Input Status | Output Status | Action |
|---|---|---|---|---|
| T1 | Phase 1 | confirmed/planned | pending_prod | AI analysis (skip UAT) |
| T2 | Phase 2a | pending_prod | deployed_prod | PROD deploy |
| T2 (next) | Phase 2b | pending_uat_merge | uat_merged | UAT deploy/merge |
T2 deadline matters. If admin approves UAT merge before T2 on the same day, the merge runs that night. If approved after T2, it runs the following night's T2. Always communicate the cutoff time to the team.
| Status | Flow | Colour | Meaning | Next Action |
|---|---|---|---|---|
submitted | Both | Grey | Bug reported, awaiting review | Admin confirms/rejects |
confirmed | Both | Blue | Valid bug, enters pipeline | T1 auto-process |
analyzing | Both | Purple | AI analysis running (transient) | Auto → planned |
planned | Both | Indigo | AI fix plan recorded | T1 auto-deploy |
deployed_uat | Flow 1 | Cyan | UAT deployed, awaiting human validation | Admin approves PROD |
pending_prod | Both | Yellow | Queued for PROD at next T2 | T2 auto-deploy |
deployed_prod | Both | Green | PROD deployed | Flow1: done; Flow2: admin approves UAT merge |
pending_uat_merge | Flow 2 | Purple | Queued for UAT merge at next T2 | T2 auto-merge |
uat_merged | Flow 2 | Teal | UAT updated with PROD fix | Flow 2 complete ✅ |
closed | Both | Emerald | Manually closed | — |
rejected | Both | Red | Not a valid bug | — |
| Severity | Pipeline Eligible? | Notes |
|---|---|---|
low | ✅ Yes | Both flows |
medium | ✅ Yes | Both flows |
high | ❌ No | Emergency Hotfix only |
critical | ❌ No | Emergency Hotfix, immediate escalation |
Never let high/critical bugs wait for a scheduled pipeline. Treat them as emergency hotfixes.
Scenario: Critical or high severity bug in PROD. Cannot wait for scheduled T1/T2.
Critical bug found in PROD
│
│ 🧑 HUMAN: Admin confirms severity = critical/high
│ - Does NOT enter pipeline (no confirmed status)
│ - Opens direct hotfix branch
▼
Fix developed (manually or with AI assist)
│
│ 🧑 HUMAN: Admin deploys directly to PROD
│ - Updates bug status to deployed_prod manually
│ - Records fix details in ai_fix_diff field
▼
[deployed_prod] (manual)
│ 📲 Telegram: "Emergency hotfix deployed to PROD. [Bug title]"
│
│ 🧑 HUMAN: Validates PROD immediately
│
└─ If UAT is ahead → manually cherry-pick to UAT branch
If UAT is same version → update UAT as well
▼
✅ Emergency resolved
Scenario: A deploy (T1 or T2) introduces a regression or new failure.
Issue detected after deploy
│
├─ Severity: minor UX glitch → Monitor, schedule fix in next pipeline
│
├─ Severity: functional regression → Rollback immediately
│
└─ Severity: data corruption risk → Rollback + escalate + engage DBA
Regression detected post-deploy
│
│ 🧑 HUMAN: Admin confirms rollback needed
│ - Record: what was deployed, when, what broke
▼
│ 🤖 SYSTEM or 🧑 HUMAN: Execute rollback
│ - Docker: docker compose down && git checkout <prev_tag> && docker compose up
│ - DB migration: apply down migration if schema changed
│ - Status of affected bugs → revert to previous status
▼
│ 📲 Telegram: "Rollback executed for [version]. Monitoring."
│
│ 🧑 HUMAN: Post-rollback validation (5–10 min smoke test)
│
└─ Stable → document in HISTORY + schedule proper fix
Unstable → escalate
⚠️ These times are project-specific. Adapt per project SLA and business hours.
| Slot | Name | Phase | Typical Window |
|---|---|---|---|
| T1 | UAT/PROD-queue Deploy | Phase 1 | Off-peak evening (e.g. 20:00) |
| T2 | PROD/UAT-merge Deploy | Phase 2 | Late evening (e.g. 22:00) |
Principles for choosing T1/T2:
Use these as the standard message format for each pipeline node.
🔧 Bug Fix Pipeline — Flow 1 已部署 UAT
• #<id> [<severity>] <title>
• ...
📦 Release: <version>
✅ 請驗收 UAT:<UAT_URL>
確認後請點「批准推 PROD」。
下次 T2 時間:<T2_time>
🚀 Bug Fix Pipeline — Flow 1 已部署 PROD
• #<id> [<severity>] <title>
✅ Flow 1 完成。UAT 與 PROD 版本已對齊。
🔧 Bug Fix Pipeline — Flow 2 已排隊部署 PROD
• #<id> [<severity>] <title>
⏳ 今晚 T2(<T2_time>)自動部署至 PROD。
部署後請驗收,確認後點「批准 Merge UAT」。
🚀 Bug Fix Pipeline — Flow 2 已部署 PROD
• #<id> [<severity>] <title>
⚠️ 請登入 PROD 驗收。
確認正常後點「批准 Merge UAT」。
下次 T2 時間:<T2_time>
✅ Bug Fix Pipeline — Flow 2 完成
• #<id> [<severity>] <title>
🎉 Fix 已同步至 UAT。Flow 2 全流程完成。
🚨 Emergency Hotfix — <PROD/UAT>
Bug: #<id> [<severity>] <title>
時間:<datetime>
部署人:<admin>
狀態:已部署,請立即驗收
需要跟進:<yes/no — UAT cherry-pick needed>
⚠️ Rollback 執行 — <environment>
原因:<brief reason>
回滾至:<version/commit>
時間:<datetime>
執行人:<admin>
狀態:已回滾,正在監控
下一步:<scheduled fix / investigation>
When setting up a new project with this workflow:
fix_flow, found_in_env, and status enum (see Status Reference)approve-prod, approve-uat-merge, batch variantsRun before every scheduled deploy window.
After each T1 or T2 deploy, monitor for a minimum of 10 minutes before standing down.
| Metric | Healthy Threshold | Action if Breached |
|---|---|---|
| HTTP 5xx error rate | < 0.5% | Investigate immediately, consider rollback |
| API response time (p95) | < baseline + 20% | Check DB queries, cache hit rate |
| Memory usage | < 85% | Check for memory leaks in new code |
| CPU usage | < 80% sustained | Check for infinite loops or expensive queries |
| Login / auth success rate | > 99% | Auth regression — rollback candidate |
| Key business flow (e.g. task create) | Working end-to-end | Smoke test immediately post-deploy |
If any smoke test step fails → rollback immediately, do not wait.
Scenario: A bug fix requires changes to more than one service (e.g. backend API + frontend, or service A + service B).
Always deploy in dependency order:
Backend (API) first → Frontend second
Shared library → Dependent services
DB migration → Application code
Never deploy in reverse order — it risks breaking in-flight requests.
Tag the bug with affected services. Use release notes to list which service each fix applies to:
[backend] Fix: null pointer in task update handler
[frontend] Fix: error boundary not catching API timeout
Certain periods should have no scheduled pipeline deploys (T1/T2 suspended). Emergency hotfixes may still be approved by escalation.
| Period | Recommended Action |
|---|---|
| Public holidays | Suspend T1/T2. Emergency hotfix requires 2-person approval. |
| Lunar New Year (3 days) | Full freeze. P1 only with CTO sign-off. |
| Major client go-live week | Freeze for that client's system. Other systems normal. |
| End-of-month financial close | Freeze financial modules. Other modules normal. |
| Planned system maintenance | Coordinate freeze window in advance, notify stakeholders. |
In pipeline config or environment variable:
DEPLOY_FREEZE=true # hard freeze, all deploys blocked
DEPLOY_FREEZE_MODULES=financial # module-specific freeze
DEPLOY_FREEZE_UNTIL=2026-02-05 # auto-lift date
FLOW SELECTION:
Same version? → Flow 1
UAT ahead? → Flow 2
Critical/High? → Emergency Hotfix
Freeze window? → Block (escalate for emergency)
FLOW 1: confirmed → [T1] deployed_uat → [human] pending_prod → [T2] deployed_prod ✅
FLOW 2: confirmed → [T1] pending_prod → [T2] deployed_prod → [human] pending_uat_merge → [T2] uat_merged ✅
ROLLBACK: detect → confirm → execute → validate → document
SEVERITY:
low/medium → pipeline eligible
high/critical → emergency hotfix only
MULTI-SERVICE: backend first → validate → frontend → validate
PRE-DEPLOY: backup ✓ monitoring ✓ on-call ✓ freeze-check ✓ rollback-path ✓
POST-DEPLOY: monitor 10min → smoke test → stand down