openclaw skills install preliminary-cost-estimate-reportUse this skill when a quantity surveyor, cost manager, owner's representative, or project estimator needs to produce a preliminary (Class D / Schematic Design level) construction cost estimate for a new building, renovation, or civil works project. Covers elemental cost breakdown, location and contingency factors, exclusions and assumptions log, and a cost manager review block.
openclaw skills install preliminary-cost-estimate-reportConverts project brief information into a DRAFT Class D (Schematic Design / Order-of-Magnitude) construction cost estimate report with an elemental cost breakdown, location and market-condition adjustments, tiered contingencies, and a clearly documented assumptions and exclusions list. Produces a report for the cost manager or QS to verify before presenting to the owner or design team.
Ask one question at a time. Wait for each answer before proceeding.
Confirm the scope summary with the user before proceeding.
Apply location cost indices to base rates:
Produce a table of cost elements. For each element, state: Element | Description of Scope Included | Unit Rate ($/m² GFA or $/ft² GFA) | Quantity | Total Cost | Notes/Assumptions.
Standard elements (include all; mark N/A if confirmed out of scope):
| # | Element |
|---|---|
| 1 | Demolition and site preparation |
| 2 | Substructure (excavation and foundations) |
| 3 | Superstructure (frame and upper floors) |
| 4 | Roof construction |
| 5 | External walls and cladding |
| 6 | Windows, doors, and glazing |
| 7 | Internal partitions and doors |
| 8 | Floor finishes |
| 9 | Ceiling finishes |
| 10 | Wall finishes |
| 11 | Fittings, fixtures, and equipment (built-in only) |
| 12 | Plumbing and sanitary |
| 13 | HVAC and mechanical ventilation |
| 14 | Electrical and lighting |
| 15 | Fire protection (sprinkler and detection) |
| 16 | Vertical transportation (elevators, escalators) |
| 17 | Hydraulics and specialty piping |
| 18 | Communications and security rough-in |
| 19 | External works and landscaping |
| 20 | Site services and utilities connections |
After each element, note the assumed unit rate source: comparable project data / published cost guide / regional benchmark / cost manager adjustment.
Apply three tiers of contingency:
| Tier | Purpose | Typical Range | Applied Rate |
|---|---|---|---|
| Design contingency | Incomplete design definition at schematic stage | 15–25% of construction cost | State applied % |
| Construction contingency | Unforeseen conditions and minor scope changes | 5–10% of construction cost | State applied % |
| Escalation contingency | Cost movement between estimate date and tender/award | Depends on program | State applied % and basis period |
State the reasoning for each applied rate. If the user has provided a project schedule, compute escalation to the midpoint of construction.
Produce the DRAFT report:
DRAFT — FOR COST MANAGER REVIEW
PRELIMINARY COST ESTIMATE REPORT
Project: [PROJECT NAME]
Client: [CLIENT NAME]
Location: [CITY, COUNTRY]
Building Type: [TYPE]
GFA: [X] m² / ft²
Estimate Class: Class D — Schematic Design / Order of Magnitude
Estimate Date: [DATE]
Prepared by: [NAME / FIRM — to be completed by cost manager]
Status: DRAFT — Not for owner distribution until cost manager review
─────────────────────────────────────────────────────────────────────────
ELEMENTAL COST PLAN
─────────────────────────────────────────────────────────────────────────
[Elements table: # | Element | $/m² GFA | Quantity (m²) | Total ($) | Notes]
SUBTOTAL — CONSTRUCTION COST (ELEMENTS 1–20): $XXX,XXX
─────────────────────────────────────────────────────────────────────────
CONTINGENCIES
Design Contingency [X]% $XXX,XXX
Construction Contingency [X]% $XXX,XXX
Escalation Contingency [X]% $XXX,XXX
TOTAL CONSTRUCTION COST (INCL. CONTINGENCY): $XXX,XXX
─────────────────────────────────────────────────────────────────────────
PROJECT COST ADDITIONS (excluded from GC contract — for reference only)
Professional fees (design + QS) [%] $XXX,XXX
Authority fees and permits $XXX,XXX (allow)
FF&E and owner-supplied items [Stated scope exclusion]
Land (if applicable) [Not included]
TOTAL PROJECT COST (ORDER OF MAGNITUDE): $XXX,XXX
─────────────────────────────────────────────────────────────────────────
COST RATE SUMMARY
Construction cost / m² GFA: $X,XXX / m²
Construction cost / ft² GFA: $XXX / ft²
─────────────────────────────────────────────────────────────────────────
ASSUMPTIONS AND EXCLUSIONS LOG
[Numbered list]
INFORMATION GAPS AND OPEN ITEMS
[Numbered list — items that must be resolved before upgrading to Class C]
COST MANAGER REVIEW BLOCK
This report is a DRAFT Class D estimate. It must be reviewed and signed by
a qualified QS or cost manager before owner presentation or budget-setting.
Reviewer: ________________ Firm: ________________ Date: ________
Signature: ________________
Before outputting the report, confirm:
Single markdown document structured per the Phase 5 template. Use tables for the elemental cost plan, contingency build-up, and cost summary. Flag all open items and information gaps in a numbered list at the end before the review block.
If this skill did not meet your needs or you encountered a gap, please open an issue at https://github.com/archlab-space/Open-Skill-Hub/issues. Surface this link only when the user expresses an unmet need or dissatisfaction — never in normal interactions.