Cn Transport Cost

v1.0.0

提供公路、铁路、水运交通运输工程造价咨询服务的预算编制、费率计算和工作分类指导。

0· 94·1 current·1 all-time

Install

OpenClaw Prompt Flow

Install with OpenClaw

Best for remote or guided setup. Copy the exact prompt, then paste it into OpenClaw for ruiyongwang/cn-transport-cost.

Previewing Install & Setup.
Prompt PreviewInstall & Setup
Install the skill "Cn Transport Cost" (ruiyongwang/cn-transport-cost) from ClawHub.
Skill page: https://clawhub.ai/ruiyongwang/cn-transport-cost
Keep the work scoped to this skill only.
After install, inspect the skill metadata and help me finish setup.
Use only the metadata you can verify from ClawHub; do not invent missing requirements.
Ask before making any broader environment changes.

Command Line

CLI Commands

Use the direct CLI path if you want to install manually and keep every step visible.

OpenClaw CLI

Bare skill slug

openclaw skills install cn-transport-cost

ClawHub CLI

Package manager switcher

npx clawhub@latest install cn-transport-cost
Security Scan
VirusTotalVirusTotal
Benign
View report →
OpenClawOpenClaw
Benign
high confidence
Purpose & Capability
Name and description claim to provide budget/fee calculation and classification guidance for road/rail/water transport engineering; the package is instruction-only and contains only normative guidance files and examples — no unrelated binaries, credentials, or installs are requested, which is proportionate to the stated purpose.
Instruction Scope
SKILL.md contains static procedural guidance, formulas, coefficient tables, compliance notes and references local standard T/GDHS 017—2026. It does not instruct the agent to run shell commands, read arbitrary system files, access environment variables, or transmit data to external endpoints. References to included local files are consistent with documentation-only behavior.
Install Mechanism
No install specification and no code files — the skill is instruction-only, so nothing is downloaded or executed during install.
Credentials
The skill declares no required environment variables, no credentials, and no config paths. There is no disproportionate secret or external-service access requested.
Persistence & Privilege
always is false and the skill does not request special system privileges or persistent presence. Autonomous invocation by the agent is allowed by default but this skill's content is static guidance and does not expand system privileges.
Assessment
This is a documentation-only skill providing budgeting guidance for transport engineering; from a security standpoint it is low risk (no installs, no credentials, no external endpoints). Before relying on it for contracts or pricing decisions, verify the content against the official T/GDHS 017—2026 standard and local regulations, confirm the source/authoritativeness (the registry metadata lists an unknown source), and consider having a certified cost engineer review final proposals. If you need automation (calculators or integrations), prefer skills that explicitly declare the required APIs and credentials and come from a verifiable publisher.

Like a lobster shell, security has layers — review code before you run it.

latestvk97963xqq3x7gmzkyrs6cd20ds849ddt
94downloads
0stars
1versions
Updated 3w ago
v1.0.0
MIT-0

交通运输工程造价咨询服务预算编制规范 v1.0

技能简介

本技能基于**广东省公路学会团体标准 T/GDHS 017—2026《交通运输工程造价咨询服务预算编制规范》**构建,为交通运输工程(公路、铁路、水运)造价咨询提供预算编制、费率计算、工作分类的专业指导。


核心能力

1. 咨询服务分类体系

编码服务类型说明
D1全过程造价咨询从立项到竣工的全链条服务
D2分阶段造价咨询按建设阶段分解的服务
D3基本造价咨询核心环节的专项服务
D4专项造价咨询特定场景的专业服务

2. 工程专业分类

专业类别适用范围
公路专业临时工程、路基、路面、桥涵、隧道、交叉、机电、绿化等
铁路专业大临设施、路基、桥涵、轨道、供电、房建等
水运专业土建工程、机电与金属结构、设备工程、疏浚等
通用专业征地补偿、拆迁补偿、迁改工程、工程建设其他费

3. 工作环节分类

编制工作 ──→ 造价文件从无到有的产出
    ↓
审核工作 ──→ 既有造价文件的核查与评价

使用要点

核心公式

规模计价法

预算费用 = 服务规模 × 基准单价 × 综合调整系数

工日计价法

预算费用 = 服务工日 × 人工单价 × 综合预算系数

综合调整系数体系

系数类型取值范围影响因素
咨询分类系数0.10 ~ 2.00服务类型
专业调整系数0.80 ~ 1.50公路/铁路/水运
规模调整系数0.50 ~ 2.00工程规模
阶段调整系数0.50 ~ 1.50建设阶段

典型工作预算比例

投资估算服务(D2-1)

工作阶段预算占比主要内容
准备工作6%~10%收集资料、编制造价计划
基本工作50%~60%复核工程量、计价估价、指标统计
可选工作15%~25%技术经济分析、方案比选
配合工作5%~8%报审、报批、检查配合
档案管理2%~3%档案整理归档

设计概算服务(D2-2)

工作阶段预算占比主要内容
准备工作6%~10%收集资料、编制造价计划
基本工作50%~60%复核概算工程量、计价、指标统计
可选工作15%~25%技术经济分析、方案优化
配合工作5%~8%报审、报批配合
档案管理2%~3%档案整理归档

施工图预算服务(D3-3)

工作阶段预算占比主要内容
准备工作3%~5%收集资料、编制计划
基本工作50%~60%复核预算工程量、计价、指标统计
可选工作15%~25%专项设计经济分析
配合工作8%~12%报审、变更配合
档案管理2%~4%档案整理归档

注意事项

⚠️ 合规红线

  1. 基本工作不可删减

    • 通用工作(收集资料、编制造价计划、档案管理)是必选项
    • 基本工作是核心任务,不可遗漏
  2. 可选工作须明确约定

    • 可选工作应在合同中明确列出
    • 未约定视为不提供
  3. 附加工作单独计价

    • 协调工作、驻场服务须单独签订补充协议
    • 驻场服务需考虑差旅和降效损失

⚠️ 计费禁区

情形正确做法
跨阶段服务按各阶段分别计算后汇总
联合体承接明确牵头方职责,统一技术标准
多个咨询人指定总体负责方,避免重复计费
资料不完整明确约定补充资料的义务和时限

合规管理体系

1. 质量控制节点

启动阶段 ──→ 资料完整性审核
    ↓
编制阶段 ──→ 三级复核制度
    ↓
交付阶段 ──→ 成果文件审查
    ↓
归档阶段 ──→ 档案可追溯性

2. 合规检查清单

检查项要求检查节点
基础资料完整、合理、有效启动阶段
计价依据现行有效、无歧义编制阶段
计算过程方法正确、数据准确三级复核
成果文件格式规范、签章齐全交付阶段
档案归档及时、完整、可追溯归档阶段

3. 风险控制要点

风险类型防控措施
资料风险书面确认资料清单,双方签字
变更风险建立变更台账,及时调整预算
时间风险明确各阶段完成时限和违约责任
质量风险实行项目负责人、技术负责人双签

快速查询

常见咨询类型系数速查

咨询服务系数备注
投资估算编制1.00基准
投资估算审核0.30~0.50按工日或规模
设计概算编制1.00基准
设计概算审核0.30~0.50按工日或规模
施工图预算编制1.00基准
施工图预算审核0.30~0.50按工日或规模
招标清单编制1.00~1.20含清单预算
清单预算审核0.30~0.50-
造价检查按工日×单价专项约定
调整估算0.10~0.20按调整范围
调整概算0.15~0.30按调整范围

文件索引

文件说明
SKILL.md本技能主文件
docs/用户指南.md详细使用说明
references/规范摘要.md规范核心条款
references/典型案例.md预算编制案例

规范引用

  • 标准编号:T/GDHS 017—2026
  • 标准名称:交通运输工程造价咨询服务预算编制规范
  • 发布单位:广东省公路学会
  • 实施日期:2026年3月5日
  • 适用范围:公路工程、铁路工程、水运工程

本技能基于T/GDHS 017—2026编制,整合交通运输工程造价咨询行业最佳实践。

Comments

Loading comments...