Install
openclaw skills install chaosControlled fault injection and resilience validation. Use when testing failover or dependency assumptions.
openclaw skills install chaosStructured guidance for chaos engineering (fault injection, game days): confirm triggers, propose the stages below, and adapt if the user wants a lighter pass.
Trigger conditions:
Initial offer: Explain the four stages briefly and ask whether to follow this workflow or work freeform. If they decline, continue in their preferred style.
Anchor on blast radius control. Ask what success looks like, constraints, and what must not break. Capture unknowns early.
Translate goals into a concrete plan around hypotheses and abort criteria. Compare alternatives and explicit trade-offs; avoid implicit assumptions.
Execute with verification loops tied to observability during faults. Prefer small steps, measurable checks, and rollback points where risk is high.
Close the loop with learning loop and fixes: monitoring, documentation, stakeholder updates, and lessons learned for the next cycle.