cgma-finance / 世界一流财务管理体系建设专家

v1.0.0

【中文】世界一流财务管理体系建设专家 Skill(简称 cgma-finance)— 基于CGMA全球管理会计原则,从零构建或深度重构企业财务管理体系, 输出三件套交付物(白皮书MD + CSV能力清单 + HTML演示文稿), 支持麦肯锡/BCG咨询风格,适合CFO/董事会级别汇报。 触发词:cgma财务体系、...

0· 48·0 current·0 all-time

Install

OpenClaw Prompt Flow

Install with OpenClaw

Best for remote or guided setup. Copy the exact prompt, then paste it into OpenClaw for yjkj999999/cgma-finance.

Previewing Install & Setup.
Prompt PreviewInstall & Setup
Install the skill "cgma-finance / 世界一流财务管理体系建设专家" (yjkj999999/cgma-finance) from ClawHub.
Skill page: https://clawhub.ai/yjkj999999/cgma-finance
Keep the work scoped to this skill only.
After install, inspect the skill metadata and help me finish setup.
Use only the metadata you can verify from ClawHub; do not invent missing requirements.
Ask before making any broader environment changes.

Command Line

CLI Commands

Use the direct CLI path if you want to install manually and keep every step visible.

OpenClaw CLI

Bare skill slug

openclaw skills install cgma-finance

ClawHub CLI

Package manager switcher

npx clawhub@latest install cgma-finance
Security Scan
Capability signals
Crypto
These labels describe what authority the skill may exercise. They are separate from suspicious or malicious moderation verdicts.
VirusTotalVirusTotal
Benign
View report →
OpenClawOpenClaw
Benign
high confidence
Purpose & Capability
Name/description promise (whitepaper MD, CSV checklist, HTML presentation based on CGMA/consulting best practice) matches what the SKILL.md describes and requires — no unrelated credentials, binaries, or capabilities are requested.
Instruction Scope
SKILL.md mainly contains templates, deliverable specs, triggers and prompts for generating reports; it does not instruct the agent to read system files, access environment variables, or send data to third-party endpoints. It will, as expected, consume user-provided business/financial inputs to produce assessments and deliverables.
Install Mechanism
The packaged skill is instruction-only (no install spec). README suggests optional installation methods (ClawHub one-click or git clone from a GitHub repo). Pulling code from an external GitHub/ClawHub page is standard but means you should verify the remote repository before cloning.
Credentials
No required environment variables, credentials, or config paths are declared. The skill does not request unrelated secrets or system credentials.
Persistence & Privilege
always:false (no forced inclusion). disable-model-invocation is false (normal — agent may invoke it autonomously). The skill does not request system-wide config changes or access to other skills' credentials.
Scan Findings in Context
[no_regex_findings] expected: No code files were present for the regex-based scanner to analyze; this is expected for an instruction-only skill. Absence of findings is not evidence of safety beyond what's visible in SKILL.md/README.
Assessment
This skill appears coherent and focused on generating finance deliverables. Before installing: (1) verify the remote repository or ClawHub page linked in the README to ensure the source code is trustworthy if you plan to clone; (2) do not supply sensitive credentials — the skill does not need API keys or AWS/SSH credentials; (3) be aware the skill will ask for company financial/operational inputs to produce assessments — avoid pasting secrets you don't want stored; (4) inspect any generated HTML for external resource links before sharing publicly; and (5) if you install code locally, review the repo files for unexpected scripts that would run on your machine.

Like a lobster shell, security has layers — review code before you run it.

latestvk97dkghqvp8efjzns0zn7qg2n585mpx1
48downloads
0stars
1versions
Updated 1d ago
v1.0.0
MIT-0

世界一流财务管理体系建设专家 Skill

作者:Wang Dongjie 王东杰 资深复合型战略财务专家 · 上市公司资本运作操盘手 · 集团化财务管控与风险治理高级工程师 📧 Wdj_@163.com · 📱 13952453499

概述 / Overview

本 Skill 由 Wang Dongjie 王东杰 创作,提供一套完整的方法论和工具链,基于 CGMA全球管理会计原则(GMAP)McKinsey/BCG 财务管理最佳实践,帮助企业从零构建或深度重构世界一流财务管理体系。

This Skill is created by Wang Dongjie, and provides a complete methodology and toolchain based on CGMA Global Management Accounting Principles (GMAP) and McKinsey/BCG financial management best practices, helping enterprises build or deeply restructure a world-class financial management system from scratch.

核心交付物(三件套)/ Core Deliverables (Three-Piece Set):

交付物 / Deliverable格式 / Format说明 / Description
白皮书 / WhitepaperMarkdown深度专业报告,含CGMA评分、模块详解、实施路线图、RACI矩阵、KPI体系<br>Deep professional report with CGMA scoring, module details, implementation roadmap, RACI matrix, KPI system
能力清单 / Capability ChecklistCSV(UTF-8)完整能力项列表,含模块、功能描述、来源、优先级<br>Complete capability item list with module, description, source, priority
演示文稿 / PresentationHTML(麦肯锡风格 / McKinsey Style)白底黑字、SVG图表、支持键盘导航、可打印PDF<br>White background, SVG charts, keyboard navigation, print-friendly PDF

使用方法 / Usage

基础触发 / Basic Triggers

直接描述需求即可 / Simply describe your needs, examples:

  • "帮我建设世界一流财务管理体系" / "Build me a world-class finance system"
  • "重新构建财务体系,CGMA标准" / "Restructure finance system, CGMA standards"
  • "输出财务管理体系三件套(白皮书+CSV+演示文稿)" / "Generate finance system deliverables"
  • "麦肯锡风格的财务体系汇报材料" / "McKinsey-style finance presentation"

高级选项 / Advanced Options

需求 / Option说明 / Description
体系重构深度 / Depthv1.0基础版 / v2.0深度重构<br>v1.0 Basic / v2.0 Deep Restructuring
演示风格 / Style麦肯锡白底黑字 / 深蓝 / 现代科技<br>McKinsey White / Deep Blue / Modern Tech
输出物 / Output三件套 / 仅白皮书 / 仅演示文稿<br>Full Set / Whitepaper / Presentation
CGMA目标 / Target9.0(门槛)/ 9.5+(顶尖)<br>9.0 (Threshold) / 9.5+ (Top Tier)

体系架构(v2.0参考标准)/ Architecture (v2.0 Reference)

10大核心模块 / 10 Core Modules

模块 / Module能力项数 / Items覆盖率 / Coverage说明 / Description
1. 财务治理与组织架构 / Financial Governance6100%治理+合规+内控+审计+道德+财务BP<br>Governance+Compliance+Internal Control+Audit+Ethics+Finance BP
2. 战略财务规划 / Strategic Finance9100%战略规划+估值+投资组合+投资分析+情景规划<br>Strategy+Valuation+Portfolio+Investment Analysis+Scenario Planning
3. 全面预算管理 / Comprehensive Budget598%预算+预测+滚动预测+零基预算+绩效预算<br>Budget+Forecast+Roll Forecast+ZBB+Performance Budget
4. 成本管理与控制 / Cost Management598%成本管理+作业成本+精益会计+目标成本+生命周期成本<br>Cost Mgt+ABC+Lean Acct+Target Cost+LCC
5. 资金管理与现金流 / Treasury & Cash5100%现金流+营运资本+财资+流动性+外汇风险<br>Cash Flow+WC+Treasury+Liquidity+FX Risk
6. 财务风险管理 / Financial Risk8100%市场/信用/操作/流动性/数据治理风险+建模+压力测试<br>Market/Credit/Op/Liquidity/Data Risk+Modeling+Stress Test
7. 财务报告与分析 / Financial Reporting7100%管理层报告+合并+分部+XBRL+IFRS+KPI+ESG
8. 税务管理(NEW) / Tax Management4100%增值税+所得税+国际税务+转让定价<br>VAT+Income Tax+Int'l Tax+Transfer Pricing
9. 业财融合(NEW) / Business-Finance Integration4100%财务BP+数据中台+流程优化+价值分析<br>Finance BP+Data Platform+Process Opt+Value Analysis
10. 财务数字化转型 / Digital Transformation6100%共享中心+RPA+BI+AI预测+区块链+数字孪生<br>SSC+RPA+BI+AI Forecast+Blockchain+Digital Twin
M&A子体系 / M&A Subsystem590%买方策略+卖方策略+尽调+估值建模+整合管理<br>Buy-Side+Sell-Side+DD+Valuation Model+Integration

CGMA符合度评分(v2.0)/ CGMA Compliance Score (v2.0)

原则 / Principlev1.3v2.0提升 / Improvement
沟通产生影响 / Communicate to Influence9.09.5+0.5
信息具有相关性 / Inform Decision Making9.59.5-
分析创造可持续价值 / Analyze to Create Value9.59.5-
管理构建信任 / Manage to Build Trust9.09.5+0.5
综合 / Overall9.1259.5+0.375

✅ v2.0综合得分 9.5/10,已超过世界一流门槛(9.0)<br>✅ v2.0 Overall Score 9.5/10, exceeds world-class threshold (9.0)


交付物规范 / Deliverable Specifications

1. 白皮书(_v2.0.md)/ Whitepaper

必须包含章节 / Required Sections:

1. 执行摘要(核心成果 + 战略价值表格)
   Executive Summary (Core Results + Strategic Value Table)
2. CGMA全球管理会计原则(四大原则详解 + 评分对比表格)
   CGMA GMAP (4 Principles + Score Comparison)
3. 10大核心模块详解(每模块:功能描述、覆盖率、核心能力项、新增项)
   10 Core Modules (Description, Coverage, Capabilities, New Items)
4. 42个能力项全景(分布图表说明)
   42 Capability Items Overview (Distribution Chart)
5. M&A并购能力子体系(独立说明)
   M&A Capability Subsystem (Independent Section)
6. 重大突破时间线(CGMA符合度提升轨迹)
   Major Breakthrough Timeline (CGMA Score Trajectory)
7. 实施路线图(4阶段,含交付物)
   Implementation Roadmap (4 Phases, with Deliverables)
8. 速赢项目(5个,含预期收益)
   Quick Wins (5 items, with Expected Benefits)
9. 财务数字化转型路径(5阶段框架)
   Finance Digital Transformation Path (5-Stage Framework)
10. 世界一流水平认证(McKinsey标准对标表格)
    World-Class Certification (McKinsey Standard Benchmark)
11. RACI矩阵与KPI体系(责任分工 + 关键成功指标)
    RACI Matrix & KPI System (Responsibility + Key Metrics)
12. 后续建议(短期/中期/长期)
    Next Steps (Short/Mid/Long Term)
13. 附录:能力项详细清单(完整42项表格)
    Appendix: Capability Detailed Checklist (Full 42-Item Table)

2. CSV能力清单(_v2.0_详细清单.csv)/ CSV Checklist

列结构 / Column Structure:

模块/Module,能力项/Capability,功能描述/Description,来源/Source,安装日期/Date,版本/Version,状态/Status,优先级/Priority

编码 / Encoding: UTF-8(确保Excel打开中文不乱码 / Ensure Chinese displays correctly in Excel)

3. HTML演示文稿(_v2.0_演示文稿.html)/ HTML Presentation

设计规范(麦肯锡/BCG风格)/ Design Specs (McKinsey/BCG Style):

设计规范 / Design Spec要求 / Requirement
配色 / Colors白底(#FFFFFF) + 深灰文字(#333333) + 品牌蓝(#003366)强调 + 红色(#CC0000)标注<br>White bg + Dark Gray Text + Brand Blue Accent + Red Highlight
字体 / Fonts标题Georgia Bold / 正文Arial Regular
布局 / Layout结论前置(Action Title)、MECE分栏、充足留白<br>Action Title First, MECE Columns, Ample White Space
图表 / Charts纯SVG实现(雷达图、柱状图、时间线、矩阵图),无外部依赖<br>Pure SVG (Radar, Bar, Timeline, Matrix), No External Deps
页数 / Pages20-22页(含封面、目录、核心内容、认证页)<br>20-22 pages (Cover, TOC, Content, Certification)
导航 / Navigation键盘左右箭头+空格+Home+End,底部进度条<br>Keyboard Arrow+Space+Home+End, Bottom Progress Bar
打印 / Print@media print 正确分页(每slide独立一页)<br>Correct Pagination (Each Slide = 1 Page)

页面规划(21页标准版)/ Page Plan (21-Page Standard):

Block 1 - 开篇定调(3页)/ Opening (3 pages): 封面/Cover、目录/TOC、执行摘要/Exec Summary
Block 2 - 理论基础(2页)/ Theory (2 pages): CGMA原则/Principles、评分对比雷达图/Score Radar Chart
Block 3 - 模块详解(4页)/ Modules (4 pages): 10大模块卡片网格/Module Cards、详解分栏/Detailed Columns
Block 4 - 能力全景(3页)/ Capabilities (3 pages): 42项分布图/42-Item Chart、新增能力卡片/New Capability Cards、M&A子体系/M&A Subsystem
Block 5 - 实施路线(3页)/ Roadmap (3 pages): 4阶段时间线/4-Phase Timeline、速赢矩阵/Quick Win Matrix、成熟度阶梯/Maturity Ladder
Block 6 - 认证与展望(3页)/ Certification (3 pages): McKinsey认证表格/Certification Table、RACI+KPI、后续建议/Next Steps
Block 7 - 附录(3页)/ Appendix (3 pages): 能力项完整清单/Full Capability Checklist、致谢/Acknowledgement、结束页/End Page

工作流程 / Workflow

阶段1:需求确认(1轮对话)/ Stage 1: Requirements Confirmation (1 Round)

向用户确认以下选项(如未指定则使用默认值)/ Confirm the following options with the user (use defaults if not specified):

1. 建设目标 / Goal: [ ] 从零建设(基础v1.0)/ Build from Scratch (v1.0)  [ ] 深度重构(v2.0)/ Deep Restructuring (v2.0)
2. 输出物 / Deliverables: [ ] 完整三件套 / Full Set  [ ] 仅白皮书 / Whitepaper Only  [ ] 仅演示文稿 / Presentation Only
3. 演示风格 / Style: [ ] 麦肯锡白底黑字(默认)/ McKinsey White (Default)  [ ] 深蓝标准风 / Deep Blue  [ ] 现代科技风 / Modern Tech
4. CGMA目标 / CGMA Target: [ ] 9.0+(世界一流门槛)/ World-Class Threshold (9.0+)  [ ] 9.5+(顶尖水平)/ Top Tier (9.5+)

阶段2:体系设计(内部)/ Stage 2: System Design (Internal)

  1. 确定模块数量(8-10个)和每模块能力项数 / Determine module count (8-10) and capability items per module
  2. 对标CGMA能力框架2019版,确保四大领域全覆盖 / Benchmark against CGMA Framework 2019, ensure 4 domains fully covered
  3. 设计短板补齐方案(参考v1.3→v2.0的差异分析)/ Design gap-filling plan (refer to v1.3→v2.0 gap analysis)
  4. 规划实施路线图(4阶段,24周)/ Plan implementation roadmap (4 phases, 24 weeks)

阶段3:交付物生成(自动)/ Stage 3: Deliverable Generation (Auto)

按顺序生成三个文件 / Generate 3 files in order:

Step 1: 生成 白皮书_vX.X.md / Generate Whitepaper_vX.X.md
  - 路径 / Path: /Users/wdj/WorkBuddy/{session_id}/白皮书文件名.md
  - 内容 / Content: 按"交付物规范"章节要求完整输出 / Full output per "Deliverable Specifications"

Step 2: 生成 详细清单_vX.X.csv / Generate Detailed Checklist_vX.X.csv
  - 路径 / Path: 同一目录下,同名CSV文件 / Same directory, same-name CSV
  - 内容 / Content: 所有能力项,UTF-8编码 / All capability items, UTF-8 encoded

Step 3: 生成 演示文稿_vX.X.html / Generate Presentation_vX.X.html
  - 路径 / Path: 同一目录下,同名HTML文件 / Same directory, same-name HTML
  - 内容 / Content: 麦肯锡风格,SVG图表,导航交互,打印友好 / McKinsey style, SVG charts, nav interaction, print-friendly
  - 验证 / Verify: 用Playwright生成PDF并检查页数是否正确 / Use Playwright to generate PDF and check page count

阶段4:质量审查 / Stage 4: Quality Review

  • 白皮书:所有章节完整,表格渲染正确,CGMA评分一致 / Whitepaper: All sections complete, tables render correctly, CGMA scores consistent
  • CSV:42(或对应数量)行数据,编码正确 / CSV: 42 (or corresponding count) rows, correct encoding
  • HTML:所有slide可访问(键盘导航测试),打印分页正确 / HTML: All slides accessible (keyboard nav test), print pagination correct
  • 三件套:CGMA符合度数字在三个文件中一致 / 3-Piece Set: CGMA compliance numbers consistent across 3 files

阶段5:交付 / Stage 5: Delivery

使用 deliver_attachments 工具将三个文件一并交付给用户 / Use deliver_attachments tool to deliver all 3 files to the user.


CGMA评分标准 / CGMA Scoring Criteria

四大原则详细评分维度 / 4 Principles Detailed Scoring

1. 沟通产生影响(Communicate to Influence)

  • 财务信息是否驱动行动?/ Does financial info drive action?
  • 是否建立有效的利益相关者沟通机制?/ Is an effective stakeholder communication mechanism established?
  • 财务BP能力是否到位?/ Is finance BP capability in place?

2. 信息具有相关性(Inform Decision Making)

  • 信息是否及时、准确、相关?/ Is info timely, accurate, relevant?
  • 是否支持各级管理决策?/ Does it support management decisions at all levels?
  • 情景规划和竞争分析能力是否具备?/ Are scenario planning & competitive analysis capabilities present?

3. 分析创造可持续价值(Analyze to Create Value)

  • 是否通过深度分析创造长期价值?/ Does deep analysis create long-term value?
  • 估值分析和投资组合管理是否到位?/ Are valuation analysis & portfolio management in place?
  • M&A能力是否体系化?/ Is M&A capability systematized?

4. 管理构建信任(Manage to Build Trust)

  • 财务治理是否透明、合规?/ Is financial governance transparent & compliant?
  • 内部控制是否健全?/ Are internal controls sound?
  • 税务合规和ESG报告是否完善?/ Are tax compliance & ESG reporting well-established?

世界一流认证标准(McKinsey)/ World-Class Certification Standards

维度 / Dimension世界一流标准 / World-Class Standard认证门槛 / Certification Threshold
CGMA符合度 / CGMA Compliance≥9.0/109.0
能力项覆盖率 / Capability Coverage≥85%85%
实际功能覆盖率 / Actual Function Coverage≥95%95%
数字化成熟度 / Digital Maturity≥L3(智能级 / Intelligent)L3
实施路线图 / Implementation Roadmap清晰可行 / Clear & Feasible有 / Yes
模块完整性 / Module Completeness≥8个模块 / ≥8 Modules8

常见短板与补齐方案 / Common Gaps & Recovery Plans

短板 / Gap影响 / Impact补齐方案 / Recovery Plan
全面预算覆盖率<85% / Budget coverage <85%预算功能不完整 / Incomplete budget function新增零基预算、绩效预算 / Add ZBB, performance budget
成本管理覆盖率<85% / Cost mgt coverage <85%成本核算能力薄弱 / Weak cost accounting新增目标成本法、生命周期成本 / Add target cost, LCC
无独立税务模块 / No independent tax module税务合规风险 / Tax compliance risk新增模块:增值税/所得税/国际税务/转让定价 / Add: VAT/Income Tax/Int'l Tax/TP
无业财融合机制 / No business-finance integration财务业务脱节 / Finance-business disconnect新增模块:财务BP/数据中台/流程优化/价值分析 / Add: Finance BP/Data Platform/Process Opt/Value Analysis
M&A能力零散 / Scattered M&A capabilities并购成功率低 / Low M&A success rate升级为独立子体系(5项)/ Upgrade to independent subsystem (5 items)
数字化成熟度低 / Low digital maturity转型滞后 / Transformation lag新增数字化成熟度阶梯模型(L1-L5)/ Add digital maturity ladder model (L1-L5)

注意事项 / Notes

  1. CGMA符合度数字一致性 / CGMA Score Consistency:白皮书、CSV、HTML三个文件中的CGMA评分必须完全一致<br>CGMA scores must be exactly identical across whitepaper, CSV, and HTML
  2. HTML打印分页 / HTML Print Pagination:必须正确设置 @media print 样式,确保每slide独立一页<br>Must correctly set @media print styles to ensure each slide = 1 page
  3. 中文字体渲染 / Chinese Font Rendering:演示文稿HTML必须在@media print中正确设置中文字体<br>Must correctly set Chinese fonts in @media print in presentation HTML
  4. SVG图表无外部依赖 / SVG Charts No External Deps:所有图表用纯SVG实现,确保离线可用<br>All charts implemented in pure SVG, ensure offline availability
  5. CSV编码 / CSV Encoding:使用UTF-8,确保Excel(Windows)打开中文不乱码<br>Use UTF-8 to ensure Chinese displays correctly in Excel (Windows)

版本历史 / Version History

版本 / Version日期 / Date核心变化 / Core Changes
v1.02026-04初始版本,8大模块,33个能力项,CGMA 9.125<br>Initial version, 8 modules, 33 capabilities, CGMA 9.125
v2.02026-04-2710大模块,42个能力项,CGMA 9.5,麦肯锡风格,三件套完整<br>10 modules, 42 capabilities, CGMA 9.5, McKinsey style, full 3-piece set
v2.1(规划中 / In Planning)新增配置实施指南、变革管理手册、培训课程体系<br>Add config guide, change mgmt manual, training curriculum

本 Skill 由 Wang Dongjie 王东杰 创作 / Created by Wang Dongjie 资深复合型战略财务专家 · 上市公司资本运作操盘手 · 集团化财务管控与风险治理高级工程师 Senior Strategic Finance Expert · Listed Co. Capital Ops Lead · Group Finance Control & Risk Gov. Sr. Engineer 📧 Wdj_@163.com · 📱 13952453499

Comments

Loading comments...