openclaw skills install taku-planTurn an approved design into an executable implementation plan. Three-step pipeline: scope + architecture review → design review (UI only) → plan writing. Auto-detects which step to start from based on project state. Invoke when DESIGN.md exists and is approved. Triggers on "write the plan", "create implementation plan", "plan this", "review this plan", "scope check", "architecture review", "design review", "is this plan buildable", "what could go wrong", "写计划", "制定方案", "规划实施", "架构评审", "这个方案可行吗", "有什么风险", or after /taku-think completes.
openclaw skills install taku-planRule labels: [IRON LAW] means a non-negotiable correctness constraint. [GUIDANCE] means a strong default that may adapt when context justifies it.
[GUIDANCE] Default path: run the three steps in sequence. Each gate must pass before the next unless the project state clearly shows that step is already complete.
Check project state to determine where to start:
Announce which step you're starting from.
Run when the design hasn't been through strategic and technical review. Catches scope mistakes (cheap to fix now, expensive later) and architecture gaps before code is written.
Output destination: Review artifacts (scope assessment, architecture diagram, edge cases, failure modes, test mapping) are appended to DESIGN.md, NOT to PLAN.md. The plan document is pure execution content.
Full process in references/plan-review.md. Load it and follow the instructions.
Quick summary:
If review produces critical gaps → stop and address them with the user before proceeding.
Only for projects with UI/UX components. Skip entirely for CLI, API, backend, infra.
Output destination: Design review scores and fixes are appended to DESIGN.md, NOT to PLAN.md.
Scores 9 dimensions (aesthetic, typography, color, spacing, layout, motion, responsiveness, accessibility, content hierarchy). Each gets 0-10, with specific fixes for anything below 8.
Full process in references/design-review.md. Load it and follow the instructions.
Skip when: no UI, or project uses an existing design system without customization.
Use DEPTH_TIER (set by the think phase or user) to pick the plan template:
| Tier | Criteria | Template |
|---|---|---|
| Lightweight | <50 files OR single-file change (1 dir touched) | Minimal — goal, files, spec per task |
| Standard | 50-500 files, moderate scope | Full template with Execution Hints |
| Deep | >500 files OR cross-cutting change (3+ dirs touched) | Standard + mandatory architecture diagram in header |
Auto-reclassification: If scope expands mid-sprint (e.g., a "simple bugfix" touches 6 files across 3 modules), escalate one tier. Log: DEPTH ESCALATION: Lightweight -> Standard (reason: scope expanded to N files across M modules).
DESIGN.md existsBefore writing tasks, map every file that will be created or modified:
Each task is a coherent unit of work — one responsibility, one set of files, one TDD anchor. The TDD cycle (write test → verify fail → implement → verify pass) is enforced by /taku-build at build time, not repeated in every task.
Instead of enumerating every TDD step per task, define WHAT the task must deliver: behavior, contracts, key assertions, and edge cases. The build agent reads the spec and applies TDD against it.
Why spec over steps: A 5-task plan with full TDD steps per task produces 25 checklist items where ~15 are boilerplate. Specs keep the plan focused on what matters — what to build and how to verify it — while the build agent handles the how.
Use references/plan.md as the local starting scaffold for Standard and Deep plans. The rules below override the scaffold if they differ.
Every plan starts with:
# [Feature Name] Implementation Plan
> **For agentic workers:** Use `/taku-build` to implement this plan. The build agent should choose sequential, parallel, or hybrid execution unless the user explicitly overrides it.
>
> **Review context:** Scope and architecture reviews are in `DESIGN.md`. This document is execution-only.
>
> **Build Agent Contract:**
> - **Required:** Goal, Tech Stack, Execution Hints (if present), all Tasks (Depends on + Spec + Files)
> - **Optional:** Architecture details (in DESIGN.md), review artifacts (in DESIGN.md)
> - **Skip during execution:** Scope review, architecture review sections (already in DESIGN.md)
**Goal:** [One sentence]
**Architecture:** [2-3 sentences]
**Tech Stack:** [Key technologies]
---
(Standard and Deep tiers only — skip for Lightweight)
After the header and before tasks, include an optional execution hints section. The plan phase understands the dependency graph best — this section advises the build agent on execution mode and wave grouping. The build agent owns the final decision and may override.
## Execution Hints
**Suggested mode:** [Sequential | Parallel | Hybrid]
**Wave 1** — [Wave purpose]
- Task 1: [short name]
- Task 2: [short name]
**Wave 2** — [Wave purpose] *(if applicable)*
- Task 3: [short name]
- Task 4: [short name]
**Wave 3** — [Integration] *(if applicable)*
- Task 5: [short name]
Omit this section entirely for plans with 1-2 tightly coupled tasks (sequential is obvious). Include it when:
For Lightweight tier only. Use this instead of the full Plan Document Header + Task Structure:
# [Feature Name] Plan
> **Build Agent Contract:**
> - **Required:** Goal, Tech Stack, all Tasks (Spec + Files)
> - **Skip during execution:** Execution Hints (not needed for Lightweight)
**Goal:** [One sentence]
**Tech Stack:** [Key technologies]
### Task 1: [Name]
**Depends on:** none
**Files:** [paths]
**Spec:** [What to build, key assertions, edge cases]
**TDD anchor:** [Test file + test name]
### Task N: [Component Name]
**Depends on:** [Task M, ...] or `none`
**Files:**
- Create: `exact/path/to/file.py`
- Modify: `exact/path/to/existing.py:123-145`
- Test: `tests/exact/path/to/test.py`
**Spec:**
[What to build — describe behavior, contracts, and key assertions.]
Test that `function_name()`:
- returns [expected] when [condition]
- handles [edge case] by [behavior]
- raises [error] when [invalid input]
Edge cases: [empty input, concurrent access, boundary values, etc.]
**TDD anchor:** `tests/path/test.py::test_specific_behavior`
When the contract is non-obvious or the implementation approach is genuinely hard to describe, include a code sketch as part of the spec. Code blocks are optional context, not mandatory scaffolding.
These are plan failures:
After writing the complete plan, run this against the design doc:
Depends on reference points to a real task. No circular dependencies. Tasks that can run in parallel have no mutual dependency.Find issues? Fix inline.
If the design covers multiple independent subsystems, suggest breaking into separate plans. If the plan exceeds 15 tasks, decompose by subsystem or dependency layer.
Save to PLAN.md at project root (or user-specified location).
After saving:
"Plan saved to PLAN.md. If the plan is self-reviewed and within the approved scope, continue directly to BUILD.
At BUILD start, choose the execution mode yourself: sequential, parallel, or hybrid wave-based execution.
Announce a short BUILD PREFLIGHT that includes:
wave-slug: [task-slug, ...]Only stop before BUILD if the plan changed scope materially, introduced a costly or risky action, or left a key ambiguity unresolved."
Skipping reviews because the plan "looks simple." The design was a 2-page doc for "add notifications." Scope review found it touched 4 subsystems, required a new queue service, and had implications for the mobile app. "Simple" plans hide complexity in assumptions.
Prevention: Step detection is state-based, not subjective. If DESIGN.md hasn't been reviewed, run reviews.
Plan references types or functions not defined in any task. Task 3 calls UserStore.findById() but no task defines UserStore.
Prevention: Self-review checklist item 3. Read through all tasks sequentially and verify every reference has a definition.
TDD ordering violated — code step before test step. The implementer wrote the function, then wrote tests that pass against it — proving nothing.
Prevention: TDD is enforced by /taku-build at build time, not by the plan. Each task's spec defines testable behavior, and the build agent applies the write-test-first cycle automatically.
Plan exceeds 15 tasks / 130+ steps. Context limits were hit at task 14. The second half produced degraded quality.
Prevention: Scope check. Each plan produces working, testable software. Split by subsystem or dependency layer.