国顺合同风险审核

v2.0.0

国顺合同风险审核技能 V2.0 - 江苏国顺智能科技有限公司专用。自动分析工程合同(施工分包/货物采购/智能化分包),输出结构化风险报告。功能包括:(1)执行摘要 (2)付款条款分析 (3)工期与违约金评估 (4)质保金与保修条款 (5)下浮率/管理费核算 (6)合同闪光点识别 (7)风险条款谈判策略 (8)合同...

0· 108·0 current·0 all-time

Install

OpenClaw Prompt Flow

Install with OpenClaw

Best for remote or guided setup. Copy the exact prompt, then paste it into OpenClaw for jimmygx/guoshun-contract-analyzer.

Previewing Install & Setup.
Prompt PreviewInstall & Setup
Install the skill "国顺合同风险审核" (jimmygx/guoshun-contract-analyzer) from ClawHub.
Skill page: https://clawhub.ai/jimmygx/guoshun-contract-analyzer
Keep the work scoped to this skill only.
After install, inspect the skill metadata and help me finish setup.
Use only the metadata you can verify from ClawHub; do not invent missing requirements.
Ask before making any broader environment changes.

Command Line

CLI Commands

Use the direct CLI path if you want to install manually and keep every step visible.

OpenClaw CLI

Bare skill slug

openclaw skills install guoshun-contract-analyzer

ClawHub CLI

Package manager switcher

npx clawhub@latest install guoshun-contract-analyzer
Security Scan
VirusTotalVirusTotal
Benign
View report →
OpenClawOpenClaw
Benign
high confidence
Purpose & Capability
The name/description (contract risk review) aligns with the files and behavior: SKILL.md describes contract analysis and a small helper script (extract_contract.py) extracts text from PDF/DOCX. There are no unrelated env vars, binaries, or surprising capabilities requested.
Instruction Scope
SKILL.md restricts operations to ingesting uploaded PDF/DOCX or pasted text and producing a structured risk report (Feishu card format). It does not instruct reading other filesystem locations, accessing unrelated environment variables, or sending data to external endpoints. The script only extracts text locally.
Install Mechanism
No install spec is provided (instruction-only plus a small script). The included script relies on common Python libraries (pdfplumber, python-docx) but does not download code or execute remote installers. No high‑risk download URLs or archive extraction are present.
Credentials
The skill requests no environment variables, credentials, or config paths. The lack of secrets is proportionate to the skill's stated purpose.
Persistence & Privilege
The skill is not always-on, does not request persistent privileges, and does not modify other skills or system-wide configs. Autonomous invocation is allowed by default but is typical for skills and not combined with other red flags.
Assessment
This skill appears internally consistent and focused on contract analysis, but check these before installing: (1) Dependencies: the included script needs pdfplumber and python-docx if you plan to run local extraction—install them in a controlled environment. (2) Data sensitivity: uploaded contracts contain confidential business data; confirm you are comfortable having the agent process those files and verify whether the agent or hosting platform might forward data externally. (3) Feishu integration: SKILL.md specifies Feishu card output format but does not include code to post to Feishu; if automatic posting is later added, verify which Feishu credentials/endpoints are used. (4) Sample data: the repository contains real-looking sample contracts—remove or sanitize any proprietary customer data if that is a concern. Overall this skill is coherent and not requesting unrelated privileges, but treat contract files as sensitive and run in a trusted/sandboxed environment.

Like a lobster shell, security has layers — review code before you run it.

latestvk9700wxce67wqs1hk079na4szn847y1p
108downloads
0stars
2versions
Updated 3w ago
v2.0.0
MIT-0

国顺合同风险审核技能 V2.0

功能概述

分析工程合同文本(PDF/DOCX格式),自动识别风险条款与闪光条款,输出结构化风险报告,包含:

  • 📋 执行摘要:30秒看完合同要点,项目经理决策利器
  • 💰 付款条款分析:预付款/进度款/结算款/质保金全链路分析
  • 工期与违约金:绝对工期识别、违约金档位评估
  • 🧮 合同价款核算器:输入关键参数,自动测算实际净收入与资金压力
  • 💎 合同闪光点:对乙方有利的条款详细解读与谈判保护建议
  • 🎯 风险条款谈判策略:高风险条款的谈判话术与替代方案
  • 📋 履约风险清单:按时间线的全生命周期风险管控清单
  • 🔍 质保金与保修条款:响应时间/管理费/超期维修风险
  • 📉 下浮率/管理费核算:实际净收入精准测算
  • 🚨 霸王条款识别:不可抗力不顺延/不得索赔等典型霸王条款
  • 5星制综合评级:承接价值评分 + 风险系数评分双维度

输入

  • PDF文件(上传到会话)
  • DOCX文件(上传到会话)
  • 或合同关键章节文字粘贴

输出

飞书卡片消息格式,包含以下模块:

📋 执行摘要(项目经理30秒决策版)
  - 合同一句话评价
  - 核心指标红黑榜(3项最优+3项最差)
  - 承接建议与核心顾虑
  - 推荐行动

📋 合同概览
  - 合同名称、甲乙双方、签约日期
  - 合同类型(施工分包/货物采购/智能化分包)
  - 合同总价、承包方式

💰 付款条款分析
  - 预付款比例(如有)
  - 进度款支付节点和比例
  - 结算款支付节点和比例
  - 质保金比例和退还条件
  - ⚠️ 资金压力评估(自筹资金金额)

💎 合同闪光点
  - 对乙方有利的条款清单
  - 每条闪光点的保护策略
  - 谈判优先级排序

🎯 风险条款谈判策略
  - 高风险霸王条款 → 谈判话术 + 替代方案
  - 中风险条款 → 接受条件 + 保护性条款建议

🧮 合同价款核算器
  - 输入参数表格(合同总价/管理费%/下浮率%/质保金%/滞留进度款%)
  - 实际净收入计算结果
  - 资金占用成本测算
  - 各付款节点到账时间线表格

📋 履约风险清单
  - 签约阶段:风险点 + 应对措施
  - 施工阶段:风险点 + 应对措施
  - 竣工阶段:风险点 + 应对措施
  - 结算阶段:风险点 + 应对措施
  - 质保阶段:风险点 + 应对措施

⏰ 工期与违约金
  - 总工期、起止时间
  - 绝对工期条款(霸王条款识别)
  - 延期违约金(每天/每次)
  - 不可顺延的情形清单

🔍 关键风险识别
  - 🔴 高风险条款(必须关注)
  - 🟡 中风险条款(谨慎对待)
  - 🟢 低风险条款(可接受)

💡 承接建议
  - 投标/承接决策参考
  - 合同谈判要点(如可谈判)
  - 执行阶段注意事项

⭐ 综合评级
  - 承接价值评分(1-5星)
  - 风险系数评分(1-5星,越高越危险)
  - 综合建议(承接/谨慎/拒绝)

一、执行摘要(Executive Summary)

输出位置:每份报告最顶部,用醒目样式呈现 目标读者:项目经理、公司领导(30秒决策)

执行摘要结构

╔══════════════════════════════════════════════════════╗
║  📋 执行摘要                                         ║
╠══════════════════════════════════════════════════════╣
║  📌 一句话评价:                                      ║
║  [对合同的整体定性,如"高风险低利润,谨慎承接"]          ║
║                                                       ║
║  ✅ 核心优势(TOP3)                                   ║
║  1. [最优条款]                                        ║
║  2. [次优条款]                                        ║
║  3. [第三优点]                                        ║
║                                                       ║
║  ⚠️ 核心风险(TOP3)                                   ║
║  1. [最严重风险]                                      ║
║  2. [次严重风险]                                      ║
║  3. [第三风险]                                        ║
║                                                       ║
║  💰 关键数字                                          ║
║  • 合同总价:XXX万                                    ║
║  • 实际净收入:XXX万(到手率XX%)                      ║
║  • 需自筹资金:XXX万                                  ║
║  • 资金压力:[轻/中/重]                               ║
║                                                       ║
║  ⭐ 综合评级                                          ║
║  承接价值:★★★☆☆ | 风险系数:★★★★☆                  ║
║                                                       ║
║  🎯 建议:[承接/谨慎承接/不建议承接]                   ║
║  核心顾虑:[一句话说明最大担忧]                         ║
╚══════════════════════════════════════════════════════╝

执行摘要生成规则

合同总价区间最低门槛
<50万利润>8% 或 有预付款
50-200万利润>10% 或 有预付款≥20%
200-500万利润>12% 或 有预付款≥20%
>500万必须有预付款≥20% 或 付款条件极优

二、合同类型识别

本技能适用于以下合同类型:

1. 施工分包合同

  • 特点:大额(百万级)、多阶段付款、管理费5%、绝对工期
  • 代表样本:妇幼保健院1236万施工分包

2. 货物采购合同

  • 特点:固定价格、一次性付款、保密条款严格、履约保证金
  • 代表样本:撷秀中学65.8万LED采购

3. 弱电智能化分包

  • 特点:清单计价、固定总价、下浮率、限额设计
  • 代表样本:百思利114万弱电智能化(中建八局)

4. 小型工程分包

  • 特点:工程量清单风险、劳务纠纷风险、质保金5%
  • 代表样本:铜山小区28万弱电分包

5. 专业化工程分包

  • 特点:有预付款、固定总价、不得索赔
  • 代表样本:云龙山滑道25万监控安装

三、核心风险维度

(一)付款条款(权重:⭐⭐⭐⭐⭐)

条款风险分析要点
预付款有=优(通常10-30%),无=压力大
进度款比例70%=正常,低于此=资金压力大
进度款滞后30%滞留=370万滞后(1236万合同)
结算款审计周期(3-6个月)+ 核减风险
质保金2-5%,1-2年无息,资金占用大

资金压力测算公式:

实际净收入 = 合同总价 × (1 - 管理费率) × (1 - 质保金率)
           - 滞留进度款(30% × 合同总价)

(二)工期条款(权重:⭐⭐⭐⭐⭐)

绝对工期(霸王条款)识别:

"该工期已包含双休日、法定节假日、恶劣自然气候等一切不利因素" "上述工期为绝对工期,未经甲方书面同意,不得顺延"

常见不可顺延情形(需在报价中考虑):

  • 法定节假日(中秋、春节等)
  • 台风、暴雨、高温等恶劣天气
  • 大气监测/环保停工
  • 疫情隔离、政府禁令
  • 中高考、两会、农忙
  • 甲方/领导检查观摩
  • 民扰、图纸变更

延期违约金档位:

  • 1000-3000元/天(小型工程)
  • 5000-10000元/天(中型工程)
  • 合同价1%/天(货物采购),上限20%
  • 合同价10-20%(施工分包严重违约)

(三)下浮率与管理费(权重:⭐⭐⭐⭐)

类型风险点
管理费结算总价×5%,直接扣除
下浮率结算值×(1-12%),中建八局常见
综合让利管理费+下浮率叠加,实际收入骤降

实际到手测算:

某央企114万合同:
  结算值 × (1-12%) - 管理费 - 质保金
  = 114万 × 88% - (管理费) - 5.7万质保金
  ≈ 94.6万 - 管理费 - 5.7万

(四)质保金与保修(权重:⭐⭐⭐)

项目行业标准
质保金比例2-5%
缺陷责任期1-2年
响应时间4小时(紧急)/ 48小时(一般)
超期维修甲方可委托第三方,费用+50%管理费

(五)变更与索赔(权重:⭐⭐⭐⭐)

清单量风险(常见陷阱):

"清单工程量少于图纸工程量时,视为乙方让利,结算时不调整"

固定总价合同:

"不得以任何理由要求增加费用"

变更调价前提:

  • 必须有甲方书面签认的变更单
  • 必须在规定时间内上报(通常7天)
  • 单价按清单单价同比例让利

(六)农民工工资(权重:⭐⭐⭐⭐⭐)

专项条款:

  • 必须专户发放
  • 劳务纠纷4小时内平息
  • 堵门/闹事每次罚款2000-10000元
  • 未购买工程意外险可被代买×1.5倍

(七)保密条款(权重:⭐⭐⭐)

货物采购合同特有:

"违反保密义务,按合同总价50%承担违约金"

风险: 泄露业主信息、技术资料、用户名单等均可能触发

(八)安全责任(权重:⭐⭐⭐⭐)

常见条款:

"一切机械设备及人身安全事故,全部由乙方负责"

保险要求: 工程意外险必须购买


四、合同闪光点模块(增强版)

重要性:识别闪光点是谈判的基础——知道手里有什么牌,才能打好谈判仗

4.1 闪光点类型分类

🌟 A类闪光点(金牌条款,必须死守)

闪光点类型识别特征保护策略
有预付款"签约后X日内支付合同价XX%"预付款比例越高越好,20%为基准线;必须写入合同,不得口头承诺
相对工期"工期可顺延"+"须甲方书面确认"确保"不可抗力+甲方原因+设计变更"均可顺延,不设绝对工期
变更调价权"发生变更时,费用按实际发生计"必须书面签认;建议约定变更发生后14天内上报,逾期视为放弃
结算审计宽松"审计核减不超过X%"约定核减上限(如10%),超限部分由甲方承担
质保金低质保金≤3%争取降至2%;质保期尽量谈1年而非2年
质保金早退"验收后X月内无息退还"争取"验收后6个月内退80%,满1年退100%"
进度款按月付"每月25日申报,次月X日支付"月结月付优于阶段性付款,减少资金占用
甲供材"主要材料由甲方供应"减少乙方采购资金压力和材料损耗风险
有价格调整机制"材料价格波动>5%时可调价"保护乙方在材料大涨时不被套牢

🌟 B类闪光点(银牌条款,尽量争取)

闪光点类型识别特征保护策略
进度款比例高付至80%+高于行业标准(70%)时珍惜,不要轻易让步
结算周期短"验收后X月内完成审计"约定最长审计周期(如3个月),逾期视为认可乙方结算值
付款节点少3个节点以内减少验收、审计等中间环节的卡点风险
无管理费"合同价为最终价,无管理费"珍惜此类条款,务必写入合同
无下浮率不出现下浮率条款争取"总价包干,不做下浮"
履约保证金少履约保证金≤5%争取用银行保函替代现金缴纳
有调价空间"材料认质认价"在合同中明确材料定价流程

🌟 C类闪光点(铜牌条款,可做让步筹码)

闪光点类型识别特征谈判中的作用
工期相对宽松工期>90天可作为放弃绝对工期索赔权的交换筹码
违约金比例低<0.5%/天若对方要求绝对工期,可将此作为对价
响应时间宽裕48小时(非4小时)可接受缩短至24小时,换取其他重要条款
质保金第三方托管"质保金存入双方共管账户"增加质保金安全性

4.2 闪光点保护优先级矩阵

谈判筹码强度排序(强 → 弱):
预付款 → 相对工期 → 变更调价 → 无管理费 → 无下浮 → 结算周期 → 质保金比例

让步顺序(先让C类,再让B类,最后A类):
C类(工期/违约金/响应时间)→ B类(进度款比例/结算周期)→ A类(预付款/管理费/下浮率)

4.3 典型闪光点案例

案例:云龙山滑道合同(25万)

闪光点识别:
✅ 预付款30%(金牌条款)
✅ 固定总价(减少核减风险)
✅ 进度款70%(高于平均)

保护策略:
1. 预付款30%必须到账再开工,绝不垫资
2. 固定总价意味着风险大,确保清单无漏项
3. 索赔权虽被排除,但可主张"甲方违约导致的额外费用"

五、风险条款谈判策略模块(新增)

核心逻辑:识别霸王条款 → 评估风险等级 → 准备谈判话术 → 提供替代方案

5.1 高风险霸王条款谈判策略

🚨 霸王条款1:绝对工期

九、样本合同关键数据摘要

合同金额预付款进度款下浮率风险等级
妇幼保健院(施工)1236万0%70%5%管理费🔴高
云龙山滑道(智能化)25万30%✅70%🟢低
百思利(中建八局)114万待确认待确认12%🔴高

详细样本合同全文请查看 reference/samples.md