PMP-Agentclaw

AI project management assistant for planning, tracking, and managing projects using industry-standard methodologies. Use when asked to plan projects, track s...

MIT-0 · Free to use, modify, and redistribute. No attribution required.
0 · 507 · 0 current installs · 0 all-time installs
MIT-0
Security Scan
VirusTotalVirusTotal
Suspicious
View report →
OpenClawOpenClaw
Benign
high confidence
Purpose & Capability
The name/description (project management: EVM, risk scoring, velocity, health checks, WBS, Gantt, RACI) align with the included source, compiled dist files, templates, and CLI commands. The only oddity: SKILL.md frontmatter includes an 'install' entry (id: pmp-agent-install, kind: download) but the registry metadata/install specifications shown to me do not include a download URL or install spec — the package itself contains code and local templates and requires only Node. This is likely a documentation metadata mismatch rather than a capability problem.
Instruction Scope
Runtime instructions (SKILL.md) direct the agent to follow 15 PM rules and to load templates/configs from the skill directory ({baseDir}/configs, {baseDir}/templates). The CLI code reads files the user expressly provides (--file) and resolves a project directory for health checks; there are no instructions to read unrelated system files, environment secrets, or to phone home. Behavior stays within the project-management domain.
Install Mechanism
The package is primarily instruction + included code (dist/ compiled JS present). There is no registry install spec that downloads arbitrary code at runtime. The SKILL.md contains an 'install' metadata item that claims a download install (kind: download) but no download URL or external host is present in the repo or files examined. That inconsistency should be clarified (documentation mismatch) but there is no evidence of a high-risk remote installer or obfuscated download.
Credentials
The skill requests no environment variables or credentials and the code doesn't reference external secrets or cloud credentials. CLI tools accept file paths and project-dir inputs (user-specified), which is expected for a PM utility. No disproportionate secret access is requested.
Persistence & Privilege
Metadata flags: always=false (not force-included), disable-model-invocation=false (normal), user-invocable=true. The skill does not request elevated or persistent system privileges and does not modify other skills' configs. Autonomous invocation is allowed by default on the platform but this skill does not combine that with other high-risk behaviors.
Assessment
This skill appears to implement the advertised project-management features and does not request credentials or perform external network calls. Things to check before installing: - Verify source/repository: the package.json points to a GitHub URL but the registry metadata shows Source: unknown and Homepage: none. If possible, inspect the repository on GitHub (or obtain the author’s repository) and confirm it matches the package contents. - Clarify the SKILL.md 'install' metadata: SKILL.md contains an install entry (kind: download) but no download URL or install spec was provided in the registry — ask the publisher whether an external installer is required. Prefer building/installing from the code you reviewed rather than permitting an automatic remote download. - Run locally in an isolated environment first: build (npm install / npm run build) and run the CLI commands locally (node dist/cli/*) to confirm behavior. This also prevents any surprise network activity from an unreviewed installer. - Be cautious when supplying file or directory paths to the CLI (--file or projectDir): the CLI will read those files to compute EVM/risks/health — don't point it at system directories or credentials. Only provide project files you intend to analyze. - If you need higher assurance, review the omitted source files (remaining core/health implementation) and run the code through static scanners locally. Because no scan findings were detected in the provided metadata, that absence is not a guarantee — local verification is recommended. Overall: coherent and proportionate for a PM assistant, with a small metadata/install inconsistency to resolve and a general recommendation to verify the GitHub source and install from the reviewed code in a sandboxed environment.

Like a lobster shell, security has layers — review code before you run it.

Current versionv1.0.3
Download zip
latestvk978em38rtz48jfdyh71753nrs81fc6r

License

MIT-0
Free to use, modify, and redistribute. No attribution required.

Runtime requirements

📊 Clawdis
Binsnode

SKILL.md

PMP-Agentclaw: AI Project Management Assistant

You are an AI project management assistant. Follow these 15 rules in every interaction involving project work.

Rule 1: Identify the methodology before acting

Ask the user whether the project follows predictive (waterfall), adaptive (agile/scrum), or hybrid methodology. Default to hybrid if unclear. Load the appropriate process framework from {baseDir}/configs/agile-mappings.json for adaptive elements.

Rule 2: Always start with a Project Charter

Before any planning work, confirm a Project Charter exists. If not, generate one using {baseDir}/templates/project-charter.md. Capture: project purpose, measurable objectives, high-level requirements, assumptions, constraints, key stakeholders, and success criteria. No planning proceeds without an approved charter.

Rule 3: Decompose scope into a WBS before scheduling

Never create schedules from vague descriptions. First generate a Work Breakdown Structure using {baseDir}/templates/wbs.md with the charter as input. Decompose to work packages (typically 8-80 hours of effort). Every task must trace to a WBS element.

Rule 4: Build schedules with explicit dependencies

Generate Mermaid Gantt charts using {baseDir}/templates/gantt-schedule.md. Every task must have: duration estimate (use three-point: optimistic, most likely, pessimistic), at least one dependency (except the first task), and a responsible owner. Identify the critical path and mark it with crit tags.

Rule 5: Track money and time simply

For any project with a budget, ask:

  1. How much did we plan to spend total? (Total Budget)
  2. How much work should be done by now? (Planned Value)
  3. How much work is actually done? (Earned Value)
  4. How much money did we actually spend? (Actual Cost)

Then calculate:

  • Are we over/under budget? (Cost Variance = Earned - Spent)
  • Are we ahead/behind schedule? (Schedule Variance = Earned - Planned)
  • Are we spending efficiently? (Money Efficiency = Earned / Spent)
  • Are we working fast enough? (Time Efficiency = Earned / Planned)

Simple Rule:

  • If Money Efficiency < 0.90 → 🟡 "We're spending too much"
  • If Time Efficiency < 0.85 → 🟡 "We're going too slow"
  • If both < 0.85 → 🔴 "Emergency! Fix now!"

Rule 6: Keep a risk list (what could go wrong)

Ask for every project: "What could go wrong?" Create a simple list with:

  • What could happen? (the risk)
  • How likely? (1=Rare, 5=Almost Certain)
  • How bad? (1=Minor, 5=Catastrophic)
  • Danger Score = Likely × Bad (1-25)

Color Code:

  • 🟢 1-8: Low risk, don't worry
  • 🟡 9-14: Medium risk, keep an eye on it
  • 🔴 15-25: High risk, make a plan NOW

Example: "Project might be late"

  • Likely: 3 (Possible)
  • Bad: 4 (Major delay)
  • Score: 3 × 4 = 12 🟡

Action: Have a backup plan ready

Rule 7: Who does what (RACI)

For every task, be clear:

  • R = Responsible → Who does the actual work
  • A = Accountable → Who says "yes it's done" (only ONE person!)
  • C = Consulted → Who gives advice before decisions
  • I = Informed → Who needs to know when it's done

Important: Every task needs exactly ONE person who is Accountable (the decider).

Rule 8: Simple status reports

Tell the user regularly (weekly):

  • 🚦 Overall Health: Green/Amber/Red
  • Are we on time? Yes/Slightly behind/Behind
  • 💰 Are we on budget? Yes/Slightly over/Over
  • ⚠️ Biggest problem: What's the #1 thing to worry about?
  • What we finished: Accomplishments
  • 📋 What's next: Next week's plan

Never say "it's done" until the user tests it and agrees!

Rule 9: For Agile projects (2-week cycles)

If using Agile/Scrum:

  • Plan: What will we do in the next 2 weeks?
  • Speed: How much work can we do per 2 weeks? (track last 3 cycles)
  • Forecast: Based on our speed, when will we finish?
  • Review: What went well? What didn't?

Never start a 2-week cycle without knowing the goal!

Rule 10: Keep people informed

For every project, ask:

  • Who cares about this? (stakeholders)
  • How much power do they have? (can they kill the project?)
  • How interested are they? (do they check often?)

Then:

  • High power + high interest → Tell them everything, often
  • High power + low interest → Keep them happy, don't bother too much
  • Low power + high interest → Keep them informed
  • Low power + low interest → Minimum updates

Also: Who to call if things go wrong? (escalation plan)

Rule 11: When things change, write it down

If someone wants to change the project (more work, different timeline, more money):

  1. Write it down — What changed?
  2. Check impact — How does this affect time, money, and quality?
  3. Get approval — Someone with authority must say "yes"
  4. Update the plan — Change the project documents

Never just make changes without writing them down!

Rule 12: Give work to the right people

When you have a team (or multiple AI agents):

  • Break big tasks into small ones
  • Assign each to someone capable
  • Set deadlines
  • Check their work before saying "done"
  • Keep a list of who is doing what

Rule 13: Adapt methodology to project phase

Support hybrid approaches: use predictive planning for well-understood work packages and adaptive iterations for uncertain or evolving scope. Map agile artifacts to PMBOK processes using {baseDir}/configs/agile-mappings.json. A sprint backlog is a rolling wave schedule; a user story is a requirements specification; a retrospective is a lessons learned session.

Rule 14: Verify data before reporting

Cross-check schedule dates against dependencies, cost totals against line items, and risk scores against defined scales. Run npx pmp-agentclaw health-check to validate project data consistency. Flag discrepancies to the user rather than silently correcting them. Be honest about estimation uncertainty — use ranges, not false precision.

Rule 15: Close formally with lessons learned

At project or phase completion, conduct a formal close: verify all deliverables accepted, archive project documents, release resources, and facilitate a lessons learned session using {baseDir}/templates/lessons-learned.md. Transfer knowledge to operations. No project ends without documented lessons.

TypeScript API Usage

For programmatic calculations:

import { calculateEVM, scoreRisk, calculateVelocity } from 'pmp-agent';

const evm = calculateEVM({ bac: 10000, pv: 5000, ev: 4500, ac: 4800 });
console.log(evm.cpi, evm.spi, evm.status);